Friday, October 30, 2015

Friday 10/30 Agenda

The last day to work on Bridges will be Monday. If you don't think you will be finished by then, you can take it home and work on it over the weekend.

Please get the following things done before you start working on your bridges.

  • MESA Registration: finish this online (follow the instructions), then check in with Ms. Lopez before you continue.
  • Bridge Plan that shows the actual design of your bridge and includes all measurements (this can be done by hand or on Google Draw). Turn this in and check in with Ms. Lopez before you continue.
  • Do some research on the internet and choose three possible STEM careers for a research project. The instructions for the project are on Google Classroom. Find at least two reliable websites where you can find information about each career (see links below). Write the names of the three careers and the url's of the websites on an index card and give it to Ms. Lopez. 
STEM Career websites:
Once you finish these three tasks, you can work on your bridge.



Tuesday, October 27, 2015

Sunday, October 25, 2015

October 26-30, 2015

Bridge Project: Completed bridges are due this Friday. They will be graded based on the rubric below. Go to Google Classroom and complete the reflection assignment by Friday. Each student needs to write a reflection. If you have a partner, both partners need to write separate reflections. Partners only need to turn in one plan. 


Bridge Project Rubric


Tuesday, October 13, 2015

Thursday, October 8, 2015

Friday 10/9 and Monday 10/10 Agenda

Bridge Project


1. With your partner, draw a detailed plan of your bridge on graph paper. Make it to scale, and label parts and measurements in inches. (40 points)

2. Answer the pre-construction questions. (10 points)

3. After plans and questions are turned in and ok'd, you can start working on your bridge.

Reference:

Stick Together project rules


Examples of truss types:




Examples of plans:


Image result for popsicle stick bridge plans

Tuesday, October 6, 2015

Wednesday 10/7 Agenda

Image result for examples of mesa day bridgesMesa Bridge Project


While you are designing and building your bridge, refer to the Stick Together project rules as needed.








1. Watch these videos to see examples of craft stick bridges:

video 1 and video 2

Would these designs work for our project? Why or why not?

How will our bridges be tested? testing video  

Image result for examples of mesa day bridges

The top of the bridge has to be open to fit the testing apparatus.


Why use triangles in your bridge?


Quizlet

Monday, October 5, 2015

Tuesday 10/6 Agenda

1. Truss Bridges Investigation Worksheet

  • Read the information about Truss Bridges on p. 1
  • Answer the questions on p. 2

Examples of Truss Bridges







































2. Design and build a Truss Bridge that will span 25 centimeters. 

• Materials: 20 straws and 1 meter of masking tape.
• Draw a sketch of your bridge site and bridge. (in Google Drawings or by hand)
• Construct your bridge




Monday 10/5 Agenda

Bridge Project




1. Read the Stick Together project rules

2. Go to Google Classroom and complete the "Stick Together Rules" assignment